-CONTACT ME -BUILDING DIVISION REDMOND, OREGON -COMMUNITY DEVELOPMENT DEPT. BEND, OREGON -DESCHUTES COUNTY PLAN REQUIREMENTS -DESCHUTES COUNTY NEW DWELLING APPLICATION -I-JOIST SPECIFICATIONS GEORGIA PACIFIC -I-JOIST SPECIFICATIONS LOWES CARRIES onCENTER -CONCRETE CALCULATOR -ORSC 2021 -GARAGE DOOR WEBSITE -CONTRACTS -ABOUT THE OWNER

Cost to Build the Sunriver Redo 6100+ [Materials Only Prices as of month/day]

Excavation for Foundation - $00.00

Foundation and Concrete - $00.00

Gravel -
Equipment rental - gravel compactor - rebar bender
Cubic Feet of Concrete -
Rebar -
Rebar Ties -
J-Bolts -
PT-Plate on Foundation Stem Wall -
Foundation Vents -
Total - $00.00

Framing First Floor - $00.00

First Floor Rim Joists -
First Floor Joists -
First Floor Sheeting -
First Floor Wall Plates - Bottom - Top - Second Top -
First Floor Studs -
Garage Studs -
First Floor Headers -
Glulams -
Blocking -
Sheeting - added under sheeting for entire house
Total - $00.00

Second Floor Framing - $00.00

Second Floor Rim Joists -
Second Floor Joists -
Second Floor Joist Sheeting -
Second Floor Wall Plates - Bottom - Top - Second Top -
Second Floor Studs -
Second Floor Headers -
Glulams -
Blocking -
Sheeting - added under sheeting for entire house -
Total - $00.00

Roof Package - $00.00

Rafters -
Bird Blocks -
Rafters over Garage -
Rafter support and Gussets -
Bardge Rafters -
Facia -
Total - $00.00

Front Porch - 00.00

Rafters on Front Porch -
Post and Beam on Front Porch -
Bardge Rafters on Front Porch -
Facia on Front Porch -
Sheeting on Front Porch -
Total - $00.00

House Sheeting - $00.00

Wall Sheeting -
Roof Sheeting -
Perimeter Roof Sheeting -
Total - $00.00

Siding - $00.00

Vapor Barrier -
Buy Siding Spacers -
Hardie Plank lap Siding -
Hardie Plank 4x8 Sheeting -
Window and Door Trim -
Garage Trim -
Corner Trim -
Flashing - Window and Door - Wall Roof Junctions - Hardie Lap Joints -
Post Wraps -
Caulk -
Nails -
Total - $00.00

Rock Part of Siding - $00.00

Rock Siding -
Rock Siding for Post Wraps -
Total - $00.00

Roofing - $00.00

Vapor Barrier -
3 Tab Roofing -
Total - $00.00

Gutter - $00.00

Drainage Pipe for Gutter Runoff -
Gutters -
Total $00.00

Windows and Exterior Doors - $00.00

3'0 x 5'0 -
4'0 x 5'0 -
2'0 x 3'0 -
Exterior Doors -
Total - $00.00

Painting - $00.00

Exterior Paint - Body - Trim -
Interior Paint - Primer for Body - Body - Trim and Doors -
Equipment Rental Sprayer -
Brushes, Rollers, Plastic, Ground cloths and Tape -
Total - $00.00

Insulation - $00.00

Walls R-19 -
Joists R-38 -
Rafters R-38 -
Total - $00.00

Sheet Rock - $00.00

1st Floor Ceiling -
2nd Floor Ceiling -
1st Floor Walls Exterior -
1st Floor Walls Interior -
Stair Walls -
2nd Floor Walls Exterior -
2nd Floor Walls Interior -
Green Sheets for Bath -
Plaster - Tape - Nails - Screws -
Tool Kit -
Metal for Corners -
Metal for Window - Slider - Barn Door Wraps -
Rental - Drywall Lift - Texture Sprayer -
Total - $00.00

Interior Trim - $00.00

Door -
Baseboard -
Stairs Baseboard -
Closet Shelves -
Windows - NA if they are wrapped with sheetrock -
Total - $00.00

Interior Doors - $00.00

2'6" x 6'8" -
2'9" x 6'8" Bi-fold Doors -
3'0" x 6'8" Bi-fold Doors -
Total - $00.00

Garage Door - $00.00

9' x 7' Lowes -
Garage Door Opener -
Instalation -
Total - $00.00

Flooring - $00.00

1st Floor Tongue and Groove Laminate -
Carpet -
Bath Tile -
Kitchen Tile -
Grout - Tools - Cement -
Cement Board -
Total - $00.00

Cabinets Kitchen and Bath with Countertops - $00.00

Kitchen and Bath Cabinets -
Cabinets may need sprayed with a lacquer -
Kitchen and Bath Counter Tops -
Kitchen Sink -
Bath Sink -
Facets - Bath - Kitchen -
Total - $00.00

Appliances - $00.00

Stove -
Microwave -
Dishwasher -
Fridge -
Washer and Dryer
Total - $00.00

Bath - Whats left - $00.00

Shower 1 Piece -
Toilet -
Mirrors -
Total - $00.00

Miscelaneous - $00.00

Door Knobs -
Nails - 2" Galvanized - 3" Galvanized -
Simpson Ties - Rafters - Wall and Joist - Foundation -
Roof Venting -
Total - $00.00

Electrical - Parts and Labor - Wires - Boxes - Fuse Box

HVAC - Labor and HVAC Unit - Ducts

Plumbing - Water Heater - Labor For Pipes -



Grand Total - $00.00 Note: The Grand Total Includes no Labor, Electrical, HVAC, and Plumbing

-Contact
-About Company Coming Soon
-About the Owner
-Contracts
-Building Division Redmond, Oregon
-Community Development Dept. Bend, Oregon
-Deschutes County Plan Requirements

-Circle Scribe
-Pop-up Bench Trainer
-Garbage Size Reducer
-House Designs
-Deschutes County New Dwelling Application
-I-Joist Specification Georgia Pacific
-I-Joist Specification Lowes onCENTER

-Website Development
-Dive Center
-Prices for Drafting Homes
-Concrete Calculate
-ORSC 2021
-Garage Door Website